-
Content Count
570 -
Joined
-
Last visited
About cherry9393
-
Rank
Paulding Com member
- Birthday 12/14/1959
Previous Fields
-
Place of Residence
Northeast Paulding
Profile Information
-
Gender
Male
-
ohh get over it. it's here and it's good.
-
The 4speed, Dual Exhaust, (thanks city muffler in c-ville),the V-8 thank you Ford!!
-
cherry9393
-
well is anyone still up n bout on the board tonite ..
cherry9393 replied to kelwil's topic in RECENT TOPICS
Roads closed. Even my son in law who is a SO couldn't help with the roads bieng washed away on every route i would have taken to get here. -
well is anyone still up n bout on the board tonite ..
cherry9393 replied to kelwil's topic in RECENT TOPICS
I have seen better days in construction. I enjoyed this till construction went down hill, But I still have a job. I left last nite from hwy 61 north near bartow line, took 2.5 hours to get down here. -
well is anyone still up n bout on the board tonite ..
cherry9393 replied to kelwil's topic in RECENT TOPICS
Plant Manager, Sr. Dispatcher, Lead Batcher and ALWAYS babysitter to most. Been doing this for last 20 years. -
well is anyone still up n bout on the board tonite ..
cherry9393 replied to kelwil's topic in RECENT TOPICS
Downtown Atlanta, near the zoo. Loading concrete for the new Hartsfield Terminal. We do this every nite around 11pm. trying to get part of it done before Thanksgiving. -
well is anyone still up n bout on the board tonite ..
cherry9393 replied to kelwil's topic in RECENT TOPICS
Still awake, but at work. -
This will take him home, but will take a while as this is what I had to do to get to work in downtown atl tonight. Take florence towards macland rd, turn right, left on bullard, left on lost mountain rd. take lost mountain to hwy 120 at the chevron/mcdonalds. Turn left on 120 to hwy 6. Took me 2 and 1/2 hours to get here from north hwy 61m but he will make it that way.
-
Anyone have a concrete parking pad poured lately?
cherry9393 replied to The Sound Guy's topic in RECENT TOPICS
FYI: I work for a concrete delivery company in downtown atl. who used to be called Williams Bros. (different name now) 3k psi runs $135.00 per yard, fiber adds $6.75 per yard, then add in the fuel and enviromental fee of arond $50.00 per truck. Patio's, Driveway's, Sidewalks, Footers, Slabs for home are all poured with 3k psi. Fiber WILL NOT STOP CRACKING, neither will WIRE. Remember there are only two kinds of concrete, 1. Already cracked 2. going to crack