Jump to content
Paulding.com

Recommended Posts

GFC requested. GFC 3 responding.

 

Dabbs Bridge and Bartow - otherwise Cobb would respond if it was at the Cobb/Bartow area.

 

I don't recognize any of the names they are mentioning as x-streets.

 

Maybe near the new subdivisions near the line.

 

SO units advises of an additional fire near Hollingshed Rd.

 

Three seperate fires - heading into woods.

 

tanker 6 on scene at DBR/Hollingshed

 

need battalion - two structures in danger

Link to post
Share on other sites

Tanker 6 - do I have another unit enroute

 

-negative

 

station 8 toned out - engine 8 responding

 

tanker 6 reports additional fire north of his location

 

E8 requesting instructions

 

E8 - stage at 1163 DBR to protect structure until GFC arrives - needed for fire working into pasture

Link to post
Share on other sites

tanker 6 had its fire under controlengine 8 was battling its fire from the road when I went by - then relocated to the driveway of this house.fire was approaching the house and engine 8 was requesting the ETA of GFC. GFC arrived a short time later and was instructed to back up the driveway to unload equipment.smoke was heavy and right at the streetBoE advised bus drivers to avoid the area since tanker 6 was still blocking the roadcommand - GFC is begining break at this time

Link to post
Share on other sites

engine 6 sent to investigate a smoking phone pole

 

this pole is in the middle of the second fire that engine 8 worked

 

it was smoking when I went by at 3:00

 

no danger - there is nothing left to burn in that area

 

station 6 advises that tanker 6 will be enroute instead of engine 6

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...